Welding system
T-floor tig welding M/C
This is a M/C to product the Base of a refrigeration container and T-floor
is designed as 8-TORCH to weld at the same time.
It is composed of three processes like tack assembly, real welding and
so on.
The transfer among process is done through chain conveyor. Also, it has
eight TIG welding machines. The machines of gantry type are transferred
on the rail.
With attaching the SEM Auto Tracking equipment, TORCH results in improvement
of welding quality.
Besides, due to installing TORCH of water cooling type it improved of
quality and productivity.
< Product Function>
- ELECTRIC : OWNER SPECIFCATION
- AIR PRESSURE : 4~6Kg/cm2
- COOLING WATER : 2~3Kg/cm2
- M/C CYCLE TIME : 15MIN/1SET(40Ft)
- M/CQ'TY : 2SET/1LINE(R/H, L/H)
- WORKER : 2MAN(OPERATER)
- DIMENSION : 4,700(W)X6,000(L)X3,060(H)
< Technology & Certification >
- WELDING LINE TRACKING M/C
- GANTRY TYPE TRACK TUNING SYSTEM
- AUTO LOADER & UNLOADER SYSTEM
|